Events

October 18, 2009 Sunday

JBR’s team has extensive experience onsite, managing and installing environments from 10′ x 10′ to 50′ x 300′. Beginning with an idea, JBR works with each client to develop an environment that will leave a lasting impression. JBR also offers shipping, installation, onsite management and storage for all products we create to “Streamline” your responsibilities onsite.

SOME EXAMPLES BELOW:

2010 Coors Light Mystery Mansion

JBR designed and built the set for the “Cold Room” at the 2010 Coors Light Mystery Mansion including the floor, walls bar and lighting (lighting supplied by Palmer Audio)

DSC_1055a DSC_1063a

2009 Coors Light Mystery Mansion

The Coors Light Mystery Mansion never fails to impress. Since its inception JBR has been contracted to build set pieces to add to the grandeur of the event.

DSC_0123 (2) coors waterwalls

Toronto International Boat Show 07-08
The National Marine Manufactures Associations was looking to add a “pro level” show that would draw attention to,  and increase attendance at the Toronto International Boat Show . JBR along with Militia Marketing created this display and show concept which involved build, installation, and show management. JBR/Militia managed 20 shows over a ten day period and filled the RICOH center for each one.

Militia Marketing

Molson Canadian Mega Keg
JBR built multiple set pieces for the 2009 Molson Canadian Mega Keg. Along with fabrication, JBR also managed shipping and installation onsite.


Oakley Launch Pool
JBR was involved in the concept, design and construction of the Oakley Launch Pool as part of the 2005-08 Wakestock Festival. Over four years this creation continued to break records as the largest on land wakeboarding stunt.

SBC Events

Red Bull Winch Masters
The Red Bull “Winch Masters” was a unique concept by Militia Marketing that involved building four insane wakeboard stunts, on a golf course. Athletes competed by doing tricks out of JBR designed pools into the water hazards of Deerhurst Golf Course. JBR was responsible for designs, material and crew management. With only 36 hours of onsite build time this event was revolutionary in the fast growing sport of wakeboarding.

Militia Marketing

Rockstar Rail Jam (Scaffold/Steel/Wood/Plastic)
JBR Managed the scaffold design and rail features for the 2004-06 Rockstar Rail Jam in Blue Mountain Villiage.

eventSing Promotions

top